What is the best time to buy a swimming pool?

Written by:


Modified on:

Reading time:

7–11 minutes

You've had the project in mind for a while. A large enough garden, a deep-seated desire to enjoy the pleasures of swimming without leaving your home, and a question that keeps coming up: where to start, and above all When to install a swimming pool at home The question of timing should not be taken lightly, especially since many owners discover a bit late that this type of project requires a lot of advance preparation.

Often, we think of summer as the starting point, whereas it is precisely the season where we risk getting stuck. Between the mandatory administrative procedures, weather conditions, the availability of installation teams, and the unavoidable deadlines related to regulations, the swimming pool project calendar obeys can quickly lengthen.

Discover without further delay what is the best time to buy a swimming pool.

In summary:

  • Autumn and spring are the two ideal periods for launching an in-ground pool project.
  • Administrative procedures (prior declaration or building permit) take 1 to 2 months: it is better to anticipate them well in advance.
  • From signing the quote to the first swim, count on an average of 2 to 4 months for a polyester shell pool.
  • Outside of the season, installers are more available and construction times are shorter.

Owners enjoying their in-ground pool from summer thanks to a well-anticipated project

Common misconception: the best time to buy a pool is not in the summer

The first instinct of many owners is to buy their pool in June, to enjoy it right away. This is understandable, but rarely achievable under good conditions.

During the busiest periods of the year, installers are overwhelmed and construction deadlines mechanically lengthen. The administrative procedures, prior declaration or building permit, also add one to two incompressible months before the work even begins.

Build an in-ground swimming pool in good conditions requires real anticipation. Owners who enjoy the pleasures of swimming from their very first summer are those who took the time to properly launch their project, several months in advance.

Comparison of the 4 seasons for buying a pool:

SeasonAdministrative proceduresConstruction site weatherInstaller availabilityTime before swimming
Autumn (Sep / Nov)IdealFavorable (dry soil)Very goodFollowing summer
Winter (Dec / Feb)IdealGel to avoid (concrete)ExcellentSpring/Summer
Spring (March / May)Tight deadlines if lateVery favorableHigh demandSummer (if steps taken in advance)
Summer (June / August)Long delaysExtreme heatVery saturatedAutumn or N+1

*Indicative installation time. May vary depending on weather conditions, local permits, and selected options.

Autumn and spring: the two best times to install your pool

Autumn (September/November): anticipate to enjoy the following summer

Autumn is, in the vast majority of cases, the ideal time to install your pool. Temperatures remain mild, the ground is not yet saturated with moisture, and conditions are good for carrying out earthworks.

From a regulatory point of view, it is also the right time to file a prior declaration of work at the town hall. With an average processing time of one month (two months for a building permit), a file submitted in June or July will be validated before the end of summer, leaving ample time to schedule the work between September and November.

Result: one in-ground pool ready to welcome the first swims as early as June.

Spring (March / May): start the work with favorable weather

Spring is the second The best time to install a swimming pool, provided that the administrative procedures had been anticipated since winter. The mild temperatures and low rainfall from March to May offered excellent construction conditions: earthworks progressed quickly and the Polyester shell installation takes place without particular weather constraints. If everything has been well prepared beforehand, the objective of filling with water before June remains entirely achievable.

However, for those who only launch the project in April or May without having anticipated the steps, the administrative delay can push back the commencement of works in the summer, and the filling with water in the autumn.

Swimming pool project calendar, launched in autumn or spring:

StageEstimated durationAutumnSpring
Contact & Quote1 to 2 weeksJulyJanuary
Prior declaration / building permit1 to 2 monthsAugust / SeptemberFebruary / March
Site preparation & excavationA few daysLate October / NovemberLate April / May
Installation of the polyester shell~4 days*NovemberMay
Commissioning & start-up1 to 2 weeksDecemberJune
First swim/June (or before!)June

The administrative procedures: an incompressible delay to integrate from the start

Even before carrying out the work, any in-ground pool requires a building permit issued by the town hall. This is a step that many owners discover too late and which can delay the entire schedule by several weeks, or even several months. It is therefore essential to integrate it into the planning as soon as one seriously considers their project, well before the start of the work.

Prior notice or building permit?

For the vast majority of inground pools from 10 to 100 m², which represents almost all residential projects, a prior declaration of work sufficient. The processing time is generally one month from the submission of the complete file to the town hall.

The building permit is required in more specific cases:

  • basin of more than 100 m²,
  • classified sector,
  • architectural or landscape protection zone,
  • or the addition of a swimming pool enclosure exceeding 1.80 m in height.

In these situations, the processing time is extended to two months, and can be prolonged if the town hall requests additional documents.

The tax declaration within 90 days after the work

Once the necessary work is completed, you have 90 days to declare your swimming pool to the tax authorities via your space impots.gouv.fr.

This declaration allows for the update of the cadastral rental value of your property, which has a direct impact on property taxIt also conditions the benefit of a temporary exemption of two years in municipalities that have voted for it, a significant saving that is permanently lost in case of late declaration.

What weather conditions favor earthworks and swimming pool installation?

What is rarely anticipated when buying a swimming pool is the direct impact of the weather on the progress of the construction site. However, climatic conditions influence the quality of the work, the execution times, and sometimes even the solidity of the final result. Choose the right time of year to carry out the necessary work, it is also to choose the best conditions for the site to proceed without a hitch.

The earthworks, soil excavation and trench shaping are particularly sensitive to moisture and frost. Waterlogged soil after a rainy winter considerably slows down machinery and can weaken the trench walls. Frost, on the other hand, makes earthworks mechanically difficult and risks compromising the stability of the trench bottom. March to May, and September to November, are the most favorable periods of the year to carry out this phase under good conditions.

The pouring of the concrete foundation, which forms the base of the hull, is particularly sensitive to negative temperatures. Below 5°C, the setting of the concrete is disrupted, which can lead to subsequent cracks or deformations. This is why the work necessary for site preparation is generally not recommended in the dead of winter, except in southern regions where the risk of frost remains limited. On the other hand, the Polyester shell installationit is itself much less sensitive to climatic hazards, which constitutes one of the major advantages of this type of in-ground pool compared to a traditional concrete pool.

At Aboral Piscines goes, the installation of a shell takes about four days, an indicative timeframe depending on the conditions and options chosen, which considerably limits exposure to weather contingencies and ensures adherence to the planned schedule.

The The best time to buy a swimming pool is the one where you have time to do things well: anticipate administrative procedures, choose your model serenely, plan the earthworks under good conditions, and benefit from attentive support. These conditions are met in autumn and spring; far from the summer pressure, and well before the first desired swim.

If you are the owner of a detached house and wish to bring your project to fruition under the best conditions, the team Aboral Piscines goes is available to assist you: from the study of your land to the commissioning of your pool, including administrative procedures and the choice of finishes.

Did you like this article?
Click on the stars to rate the article
Average rating: 5 / 5
Number of votes: 1

You may be asking yourself these questions?

1. What is the best time to buy a swimming pool?

Autumn (September/November) is the ideal time to install a swimming pool at home: installers are available, the weather is favorable for construction, and administrative procedures can be handled calmly for swimming the following summer.

2. How long does it take between purchase and the first swim?

For a shell pool, allow 2 to 4 months on average: 1 to 2 months for administrative procedures, then a few weeks for the construction and commissioning.

3. Can an in-ground pool be installed in winter?

Some phases are possible, but negative temperatures are not recommended for pouring concrete. Feasibility depends on your region and should be assessed with a specialist.

4. Do you need a building permit for an in-ground swimming pool?

For swimming pools from 10 to 100 m², a prior declaration is sufficient (time limit: 1 month). A building permit is required for areas over 100 m² or in certain protected zones (time limit: 2 months).

5. Is summer a good time to install a swimming pool?

No. In summer, installers are overwhelmed, lead times get longer, and administrative procedures can push back the water filling to the following autumn, meaning a one-year delay on the project.